Wind check · National Weather Service

Jobsite Wind Check

Enter the ZIP code of a jobsite and see the wind and gusts forecast for the rest of today, hour by hour, with the hours at or over your limit marked. The forecast is from the National Weather Service.

Check a Jobsite

A planning aid, not a go or no-go. This is a weather forecast for the area, shown as a study and planning aid. It is not a go or no-go for a lift. The wind limit for a lift comes from that crane's manufacturer and the lift plan, and conditions at boom height can differ from the area forecast.

Put in the limit from your crane’s manual or the lift plan. It starts at 20 mph, the speed above which OSHA says a qualified person must decide before people are hoisted.

Free account

See 48 Hours and Save Your Jobsites

  • The next 48 hours, not only today
  • Save your jobsites by name, so each is one tap away
  • The limit you set is remembered
Join free

A name and an email address. No card. No course to buy.

Already joined? Sign in

What the Courses Teach About Wind

Word for word from the school’s lessons. None of these is a limit for your crane.

  • The numbers are the manufacturer's. The load chart notes and the operator's manual give the maximum wind speed at which the chart applies, any capacity reductions, and the speed at which the crane must be secured.

    Mobile Crane Core: Weather, emergencies and shutting down
  • Wind can differ between ground level and the boom tip.

    Mobile Crane Core: Weather, emergencies and shutting down
  • A large, light load is the dangerous one. A big panel may have to stop work well below the chart's wind limit.

    Mobile Crane Core: Weather, emergencies and shutting down
  • When hoisting personnel, if the wind at the platform exceeds 20 mph, sustained or in gusts, a qualified person must determine whether it is unsafe to lift people (OSHA 1926.1431(k)(8)).

    Lattice Boom Crane Prep: Wind and weather on long booms
  • The competent person must adjust the equipment and the operations to address the effect of wind, ice and snow on stability and rated capacity (OSHA 1926.1417(n)).

    Lattice Boom Crane Prep: Wind and weather on long booms
  • Use the manufacturer’s required measurement location, gust interval and wind limits for the actual configuration.

    Lattice Boom Crane Prep: Wind and weather on long booms

Wind forecast: National Weather Service. weather.gov (opens in a new tab)

Learn the Rest

Wind is one part of operating. The courses cover load charts, rigging, signals and site hazards for the written exams.

Mobile crane operator

Prepare for the NCCCO mobile crane written exams.

Tower crane operator

Prepare for the NCCCO tower crane written exam.

Lattice boom crane

Prepare for the lattice boom specialty exam.

Rigger Level I

Prepare for the NCCCO Rigger Level I written exam.

See every course and its price

Questions About Wind and Cranes

What wind speed is too much for a crane?

There is no single number. The limit comes from the crane's manufacturer: the load chart notes and the operator's manual give the maximum wind speed at which the chart applies, any capacity reductions, and the speed at which the crane must be secured. The lift plan may set a lower limit, and a load with a large surface may have to stop well below it.

Why does the wind check start at 20 mph?

20 mph is the wind speed OSHA's crane standard gives for hoisting people: when hoisting personnel, if the wind at the platform exceeds 20 mph, sustained or in gusts, a qualified person must determine whether it is unsafe to lift people (29 CFR 1926.1431(k)(8)). It is a starting point for the marks on this page, not the limit for your crane. Type in the limit from your crane's manual or the lift plan.

Is the wind at the boom tip the same as the forecast?

The forecast describes conditions across an area. Wind at boom height can differ with terrain, nearby structures and gusts. Follow the crane manufacturer’s instructions for the measurement point and limits for the actual configuration.

Can I use this to decide whether to make a lift?

No. It is a weather forecast shown as a study and planning aid. The decision belongs to the people the lift plan and the regulations give it to, using the crane's own limits and the wind measured at the crane.

More Free Resources

Crane operator pay by state

Average pay and job counts for every state, from 2025 BLS data.

OSHA crane rule watch

New OSHA documents on cranes, rigging and signaling as they are published.