Free practice quiz

Free Tower Crane Operator Practice Quiz: 10 Questions With Answers

Ten practice questions from our Tower Crane Operator Certification Prep course, spread across the exam's topics: Operations, Erection, Climbing and Dismantling, Technical Knowledge, Site. Answer each one, see whether you were right and read why. No sign-in.

  • No sign-in
  • 10 questions
  • Answers explained

Tower Crane Operator Certification Prep

The course these questions come from

$200 USD

Inside today: 67 lessons, 253 practice questions, 2 timed practice exams.

View the course

Or read a free sample lesson

How This Quiz Works

  • Pick an answer and press Check my answer. You see at once whether you were right, and why.
  • At the end you get your score and the topics to work on. Nothing is hidden behind a sign-up.
  • You can use it with a keyboard: Tab to the answers, arrow keys to choose, Enter to check.
  • These are practice questions written by The Online Crane School for our own course. They are not questions from the real exam, and a practice score does not predict an exam result.

Tower Crane Operator Practice Questions

Written to the outline of the CCO Tower Crane Operator written exam (NCCCO). Topics covered: Operations, Erection, Climbing and Dismantling, Technical Knowledge, Site.

  1. Question 1 of 10 Operations The trolley travel limiting device is out of service and a spotter is being used as the alternative measure. The spotter must be used whenever the trolley works within what distance of an end stop?
    Show the answer and why

    Answer: D. 10 feet

    OSHA 1926.1435(e)(5)(i), Option B: a spotter who is in direct communication with the operator must be used when operations are conducted within 10 feet of the outer or inner trolley end stops. Option A is to mark the trolley rope where the operator can see it.

  2. Question 2 of 10 Erection, Climbing and Dismantling Two hammerhead tower cranes are installed on one site. Which arrangement does OSHA 1926.1435 allow?
    Show the answer and why

    Answer: D. One jib may pass over the other, but no crane can touch another's structure

    OSHA 1926.1435(b)(6) requires fixed jib (hammerhead) cranes to be located so that no crane can come in contact with the structure of another crane, and it permits cranes to pass over one another. Overlap at different heights is allowed. Contact is not, in service or out of service.

  3. Question 3 of 10 Technical Knowledge On a tower crane load chart, how is radius measured?
    Show the answer and why

    Answer: C. Level, from the center of rotation to the hook

    Radius is the horizontal distance from the center of rotation (the slewing axis) to the center of the hook. Measuring from the tower face gives a number that is too small, which makes the chart look more generous than it is.

  4. Question 4 of 10 Site The rotating ballast of a self-erecting tower crane swings close to the ground in an area that workers can reach. What does OSHA 1926.1424 require the employer to do?
    Show the answer and why

    Answer: C. Mark the hazard area with lines or barriers

    Where a rotating superstructure could strike or crush an employee, the employer must train the employees who work near it and erect and maintain control lines, warning lines, railings or similar barriers to mark the boundaries of the hazard area.

  5. Question 5 of 10 Operations Under OSHA 1926.1427, what must an employer ensure before an employee operates a tower crane without a trainer?
    Show the answer and why

    Answer: A. The operator is trained, certified or licensed, and evaluated

    Section 1926.1427(a) requires the employer to ensure each operator is trained, certified or licensed, and evaluated before operating. An employee who has not completed these may operate only as an operator-in-training under continuous monitoring. OSHA sets no age of 21 and no bonding requirement.

  6. Question 6 of 10 Erection, Climbing and Dismantling Which person meets OSHA's requirements to direct the erection of a tower crane?
    Show the answer and why

    Answer: D. A competent person who is assisted by qualified persons

    OSHA 1926.1404(a) requires the work to be directed by a person who is both a competent person and a qualified person, or by a competent person assisted by one or more qualified persons. That person is the A/D director. Being a certified operator, a rigger or an engineer does not by itself meet the requirement.

  7. Question 7 of 10 Technical Knowledge On a tower crane, what is "hook height"?
    Show the answer and why

    Answer: B. The vertical distance from the crane's base to the hook at its highest

    Hook height (height under hook) is the vertical distance from the base of the crane to the hook at its highest position. The level distance from the center of rotation to the hook is the radius. Lesson: Parts and terms: a tower crane from foundation to hook.

  8. Question 8 of 10 Site Which ground item at the base of a fixed tower crane is on the operator's shift inspection under OSHA 1926.1412(d)?
    Show the answer and why

    Answer: D. Ground settling under and around the supporting foundation

    OSHA 1926.1412(d) lists ground conditions around the equipment, including ground settling under and around supporting foundations and ground water accumulation. Cracks in the block, gaps at base plates, standing water or new digging are reasons to stop and report. Lesson: Foundations, supports, plumb and travel rails.

  9. Question 9 of 10 Operations When does OSHA 1926.1419 allow non-standard hand signals to be used?
    Show the answer and why

    Answer: C. When the standard ones are infeasible, if agreed first

    Non-standard hand signals may be used where the Standard Method is infeasible, or where an operation or attachment is not covered by it. The signal person, the operator and the lift director (where there is one) must contact each other before the operation and agree on the signals.

  10. Question 10 of 10 Erection, Climbing and Dismantling When may an A/D director skip the review of the erection procedures immediately before starting?
    Show the answer and why

    Answer: B. When the director has applied them to the same type and configuration of crane

    The director must review the procedures immediately before starting, unless the director understands them and has applied them to the same type and configuration of crane (1926.1404(c)). Lesson: Who directs the work and whose procedures apply.

More Free Practice

Free Tower Crane Operator sample lesson

Read one full lesson: How a tower crane works: balance, power and units.

All free practice quizzes

Ten questions and a sample lesson for each course.