A crane lift is a team job. The crane operator runs the machine, but the operator often cannot see the load being hooked up or the spot where it will land. Two people on the ground fill that gap: the rigger and the signal person. People mix the two up because the same person often does both. The jobs are different, and so are the rules for each.
The short answer
- The rigger prepares the load for lifting, attaches it, controls it and releases it.
- The signal person directs the operator with hand, voice or radio signals when the operator cannot see the load or the landing area.
The rigger is responsible for what hangs from the hook. The signal person is responsible for what the operator is told to do with it.
Where each one fits in the lift team
ASME B30.5, the standard for mobile cranes, describes the people in charge of a crane lift. The exams expect you to know who does what.
| Role | What this person is responsible for |
|---|---|
| Site supervisor | Controls the work site and makes sure the crane's work area is prepared: ground that can support the crane, room to set up, traffic kept out, power line hazards dealt with. |
| Lift director | Directly oversees the work the crane does and the rigging crew. Makes sure the people rigging and signaling are qualified and that the load is properly rigged and balanced before it is lifted more than a few inches. |
| Crane operator | Controls the crane. Must know the load weight and confirm it is within the crane's rated capacity. |
| Signal person | Directs the operator when the operator cannot see the load or the landing area. |
| Rigger | Prepares the load, attaches it, controls it and releases it. |
On a small job one person may hold two of these roles. The responsibilities do not disappear when people double up.
What the rigger does
The rigger is the last person to touch the load before it leaves the ground. The job is to:
- Know the load. Make sure the weight and the center of gravity have been obtained. A rigger is expected to refuse to rig a load when nobody knows them.
- Inspect the rigging before use and set aside anything damaged or without a legible tag.
- Use rigging that is rated for the load, in the hitch and at the angle it will be used.
- Attach it correctly to the load and to the hook, with sharp edges padded and hardware properly seated.
- Make sure the load is balanced and secure before it is lifted more than a few inches.
- Control the load with tag lines where needed, and keep people out from under it.
- Land it and unhook it safely.
- Speak up. Report any hazard to the lift director, and stop the lift if need be.
What the signal person does
The signal person is the operator's eyes. OSHA requires one in each of these situations (29 CFR 1926.1419):
- The point of operation, meaning the load's travel or the area at or near where the load is placed, is not in full view of the operator.
- The crane is traveling and the operator's view in the direction of travel is obstructed.
- Because of site-specific safety concerns, the operator or the person handling the load decides a signal person is necessary.
Look at the third one again. "The person handling the load" is often the rigger. A rigger who thinks a signal person is needed can require one.
Three rules shape the job:
- Only one person gives signals to a crane at a time.
- Directions are given from the operator's point of view. "Swing right" means the operator's right.
- If the operator loses contact with the signal person, the operator must stop until contact is restored.
When hand signals are used, they must be the ones on OSHA's Standard Hand Signals chart, unless that is infeasible or the chart does not cover the operation. You can get a printable copy of that chart from our newsletter page.
How each one is qualified
This is where the two jobs differ most.
The rigger
OSHA defines a qualified rigger as a rigger who meets the criteria for a qualified person: someone who, by a recognized degree, certificate or professional standing, or by extensive knowledge, training and experience, has successfully demonstrated the ability to solve problems relating to the work (29 CFR 1926.32 and 1926.1401).
In construction, the crane rule requires a qualified rigger in two situations:
- During assembly and disassembly of cranes, when rigging is used to put a crane together or take it apart (1926.1404).
- When workers are in the fall zone to hook, unhook or guide a load, or to make the initial connection of a load to a component or structure (1926.1425).
Being qualified is specific to the job, and the employer decides. A rigger who is qualified to rig bundles of rebar every day is not automatically qualified to rig an odd-shaped machine with an off-center weight.
The signal person
A signal person must be qualified before giving any signals (1926.1428). The rule lists what that takes: knowing the signals in use, including the Standard Method for hand signals; being competent in giving them; understanding how the crane operates and its limitations; knowing the signal rules themselves; and proving it by an oral or written test and a practical test.
The employer can meet the rule in two ways:
| Option 1 | Option 2 | |
|---|---|---|
| Who assesses | A third-party qualified evaluator, such as an accredited certifying body | The employer's own qualified evaluator |
| Portable to another employer? | Yes | No |
Either way, the documentation must be available at the site and must list each type of signaling the person is qualified for, such as hand signals or radio signals.
Can one person be both?
Yes. A rigger may also be the signal person, if qualified to signal. It is common on small crews. What does not work is assuming that a good rigger is automatically allowed to signal. The signal person qualification is its own requirement, with its own test and its own paperwork.
Who can stop a lift
Everyone, whatever their job.
- Anyone who becomes aware of a safety problem must alert the operator or the signal person by giving the stop or emergency stop signal (1926.1419).
- The operator must obey a stop or emergency stop signal, no matter who gives it (1926.1417).
So even when you are rigging and somebody else is signaling, the stop signal is yours to give.
Certification for each job
NCCCO offers separate certifications for riggers (Rigger Level I and Rigger Level II) and for signal persons. Each has its own written exam and its own practical exam, and passing one does not cover the other.
If you do both jobs, study for both. Our Rigger Level I course and Signalperson course each prepare you for the written exam, and you can try ten free practice questions for either one: rigger or signal person.