Reading a crane load chart is a five-step routine: right table, gross capacity, safe rounding, deductions, compare. Here is each step, with the rules behind it.

Load charts are a large part of the mobile crane written exams, and they are where many experienced operators lose points. The good news is that reading a chart is not guesswork. It is the same five steps every time.

One note before we start. The example numbers in this article come from the training crane we use in our courses. It is made up for study. It is not the chart of any real crane, and its numbers must never be used to plan a real lift. For a real lift, use the chart in the cab of the crane you are running.

First: the chart belongs to one crane

A load chart is written by the manufacturer for one model, and the copy in the cab belongs to that crane. Never use a chart from a different model, a different counterweight package or "one just like it".

OSHA backs this up. The rated capacities (load charts) and the operator's manual must be readily available in the cab at all times (29 CFR 1926.1417(c)(1)). If the chart is in the cab only in electronic form and a failure makes it unreadable, the operator must immediately cease operations or follow safe shut-down procedures until the rated capacities are available again (1926.1417(c)(2)).

What is in a chart package

A chart is more than one table. A typical package has:

  • Rated capacity tables: the gross capacity for each radius and boom length, with one table for each way the crane can be set up.
  • Chart notes: the conditions the numbers assume.
  • A work area diagram: where around the crane each table applies.
  • A range diagram: boom tip height and radius for each boom length and angle.
  • Deductions: the weights of blocks, balls, extensions and other items to subtract.
  • Hoist line information: reeving, rope size and the load allowed for each number of parts of line.

Read the whole package for any crane you run.

Step 1: Choose the right table

A crane has many capacity tables, and only one of them fits the way the crane is set up right now. Read a correct number from the wrong table and you have planned an overload. Four questions pick the table:

  1. How is the crane supported? Outriggers fully extended, outriggers at a shorter position, or on rubber.
  2. What counterweight is installed? Many cranes have a chart for each counterweight package.
  3. What is the load hanging from? The main boom or an extension.
  4. Which work area will the load pass through? 360 degrees, over the front, over the side or over the rear.

Outriggers deserve a second look. OSHA requires them to be either fully extended or, if the manufacturer's procedures permit, deployed as specified in the load chart (1926.1404(q)). There is no "almost fully extended" chart. A beam that is short of its position puts the crane on a different table, or on no table at all.

Step 2: Find the gross capacity

Telescopic boom charts are entered with two measurements:

  • Load radius: the horizontal distance from the centerline of rotation to the center of the freely hanging load. It is measured level, not along the boom, and not from the outrigger pad or the bumper.
  • Boom length: measured along the boom from the boom pivot to the boom tip sheave.

Find the radius row, find the boom length column, and read the number where they meet. That number is the gross capacity.

Use the largest radius the load reaches anywhere in the lift. Capacity is lowest at the longest radius, and a lift has a pick point, a swing path and a set point that can all be different. The radius also grows on its own when the load comes on, because the boom bends and the ground settles a little. Radius is measured with the load on the hook.

Step 3: Between two listed values, never round in your own favor

The chart lists radii and boom lengths in steps. Real lifts fall in between. The usual rule, and the one the exams test, is:

  • Radius between two rows: use the next longer radius.
  • Boom length between two columns: look at the next longer and the next shorter boom length, and use the smaller rating.
  • Do not interpolate. Do not split the difference.

Why not? Capacity does not fall in a straight line between two listed points, and the thing that limits the crane can change between them. The manufacturer worked out the listed points. Between them, the only number you can trust is the lower one. Always read the chart's own notes, because each manufacturer states its own rule.

Step 4: Take off the deductions

The number in the chart is what the crane can hold at the boom tip. Your load is only part of that. Chart ratings include the weight of the hook block or ball, the slings and all other load handling devices.

Net capacity = gross capacity − deductions

What to deduct is listed by each manufacturer. Typical items are the hook block, an overhaul ball, an auxiliary boom nose, an erected extension, and the actual weight of slings, shackles and spreader bars. Three points catch people:

  • Anything hanging counts, even if you are not using it. If the main block is on the boom nose and you lift with the ball, both are deductions.
  • An erected extension can cost far more than its own weight, because it hangs out past the boom tip where every pound has more leverage.
  • Every chart is different. Do not carry one crane's deduction rules to another.

Step 5: Compare, and know how close you are

Compare the weight of the load with the net capacity. If the load is heavier, the lift does not go as planned.

Here is the whole routine with our training crane's made-up numbers. A 21,000 lb transformer must be set at a 35 ft radius with 80 ft of boom, on outriggers fully extended. A hook block weighing 450 lb is reeved and the rigging weighs 350 lb.

  1. Table: outriggers fully extended, main boom.
  2. Gross capacity at 80 ft of boom and a 35 ft radius: 22,400 lb.
  3. Deductions: 450 + 350 = 800 lb.
  4. Net capacity: 22,400 − 800 = 21,600 lb.
  5. Compare: 21,000 lb is less than 21,600 lb, so the lift is within the chart.

Now work out the percent of capacity: the total load of 21,800 lb divided by 22,400 lb is 97 percent. The lift is within the chart and has almost nothing to spare. If the radius grows by a single foot, the rule in Step 3 sends you to the next longer radius, where this training crane's rating is 17,800 lb, and the same lift is 4,000 lb over. Many companies treat any lift above a set percentage of capacity as a critical lift that needs a written plan.

What the numbers assume

Chart ratings are good only under the conditions in the notes: a level crane, firm ground, a freely hanging load, no shock or side load, and wind within limits. Change one of those and the number no longer applies.

It also helps to know why a rating is what it is. Some ratings are limited by the strength of the crane's parts, and others by stability, meaning tipping. Stability ratings do not exceed 85 percent of the tipping load on outriggers, or 75 percent on tires or crawlers. A structural overload gives no warning before something breaks, which is why you never use the feel of the crane, or tipping, to judge capacity.

How to get good at it

Reading about charts is not enough. You get fast by doing chart problems until the five steps are automatic. Our Mobile Crane Operator course has practice activities where you find ratings on a chart, pick out the deductions and decide whether a lift is a go or a no-go, with new numbers every time. You can also try ten free mobile crane practice questions first.

Questions Readers Ask

What is the difference between gross capacity and net capacity?

Gross capacity is the rated load you read from the chart. It includes the hook block, the rigging and anything else hanging from the boom. Net capacity is what is left for the load itself after you subtract those deductions.

Can you interpolate between two values on a load chart?

The usual rule is no. For a radius between two rows, use the next longer radius. For a boom length between two columns, use the smaller of the two ratings. Always read the chart's own notes, because each manufacturer states its own rule.

Where is load radius measured from?

From the crane's centerline of rotation, horizontally, to the center of the freely hanging load. It is not measured along the boom or from the outrigger pad.

Do I deduct a hook block I am not using?

Yes, if it is hanging from the boom. Anything reeved or installed on the boom is weight the crane is carrying, whether or not the load is on it. The chart's deduction notes list each item.

Related Reading

Mobile crane operator training online

The Core and Specialty knowledge for the written exams.

Free mobile crane sample lesson

Types of mobile cranes, one full lesson from the course.

CCO practice tests

How practice questions fit into exam preparation.

Practice load charts until they are routine

Our mobile crane prep makes you read charts and plan lifts yourself, with timed practice exams at the end.

Ask About a Course

Tell us what training you need and our team will reply.

Or reach us directly. Phone: (307) 355-0865 · Email: info@theonlinecraneschool.com

Your details go to our own training team and are kept in our student portal so we can answer you. We do not sell them. See our privacy policy.